Ireland

The Greenlink project will require planning permission in Ireland and Wales. Greenlink is currently in the EirGrid application queue awaiting a formal connection offer, which is anticipated to be issued on the conclusion to the consultation being undertaken by the Commission for Regulation of Utilities (CRU).

Great Island has been identified as the appropriate location for the connection of the Greenlink interconnector to the existing EirGrid infrastructure. This followed a review of existing grid infrastructure and connection options. Studies are being commenced with EirGrid to confirm the final design, and the connection process is under discussion with EirGrid and the CRU.

In Ireland, Greenlink will consist of a converter station sited close to the existing Great Island substation and underground cabling, which will predominantly be routed within the local road network.

Various detailed technical and environmental surveys will be carried out during the development process to ensure that the final design fully incorporates the challenges and opportunities of the local environment. Technical and environmental studies will include:

  • bird studies;
  • ecological assessments;
  • construction and access studies;
  • landscape and visual impact assessments;
  • cultural heritage assessments;
  • geological assessments;
  • and site hydrology assessments.

The developers of the Greenlink project strongly believe that a proactive and constructive dialogue with stakeholders, throughout the development programme, will result in a high quality and comprehensive application being submitted and delivered.

Construction of Greenlink is expected to lead to significant expenditure in Ireland.  We are committed to maximising the use of locally-based contractors and personnel during the construction and operational phases of the project and are keen to hear of local businesses that could benefit. Let us know if you would like to be added to our list of local suppliers.

Full details of the proposals for the converter station and cable routes, along with the technical and environmental assessments, can be found in the public consultation Information Brochure.